War and Military Atlas

How Battles Were Fought
Sign In
Text size
100%
Theme
Weapons Systems

Admiralty Scaffolding

Modern

Citation Formats

General Reference

APA Style

BibTeX

Admiralty scaffolding, officially designated Obstacle Z.1, was a British anti-tank and anti-boat obstacle built from tubular steel and erected on English beaches during the anti-invasion preparations of the Second World War, with some sections also built inland. Its most common form, Z.1, used steel uprights nine feet high spaced four feet ten inches apart, linked by horizontal tubes and braced diagonally into twenty-foot sections; these were first set at the half-tide mark to obstruct landing craft, and later moved up to the high-water mark to stop tanks. The effort was vast: Britain installed more than 15,000 miles of scaffolding tube, consuming half the country's scaffolding steel output, at an estimated cost of 6,600 pounds a mile.

Comments (0)
No comments yet. Be the first to share a thought.
Reader Challenges (0 open reader challenges)
No disputes yet. Spotted an error or a better source? Open the first one.

View At A Past Year

The atlas records no dated fact of its own for this entry, so there is no other year to choose.