The Warrior, formally the FV510 and originally developed under the designation MCV-80, is a British tracked infantry fighting vehicle designed by GKN Defence to replace the older FV430 series of armored personnel carriers, with production beginning in 1986 and the vehicle entering British Army service in 1987. Armed with a 30mm RARDEN cannon and a coaxial machine gun and carrying a crew of three plus seven dismounted infantry, the Warrior was built around the British doctrine that an infantry vehicle's job is to deliver troops under armor protection to their objective rather than to fight mounted, and it accordingly has no firing ports for infantry to shoot from inside the hull. More than a thousand Warriors were built, the British Army received nearly eight hundred, and Kuwait purchased a further batch of modified Desert Warrior variants, with the type seeing combat service in the Gulf War, the Iraq War and Afghanistan.
Facts
Classification
Service Status Weapon ClassInfantry fighting vehicle 1 Introduced Year Weapon Class
Weapon Class (category) Connections
Operated By
Source Wikipedia: FV510 Warrior
Sources
1. Warrior tracked armoured vehicle, Wikipedia
Infobox, Type field
Infantry fighting vehicle
Article text, production and delivery
The first production vehicle was handed over to the Army in May 1987 to 1st Battalion Grenadier Guards
service-status
service = 1987-present
- Weapon class classified from the entity's own sourced description text.
Caliber attribute (warrior-infantry-fighting-vehicle)
Armed with a 30mm RARDEN cannon and a coaxial machine gun and carrying a crew of three plus seven dismounted infantry, the Warrior was built around the British doctrine that an infantry vehicle's job is to deliver troops under armor protection to their objective rather than to fight mounted, and it accordingly has no firing ports for infantry to shoot from inside the hull.
View the SourceWikidata: FV510 Warrior
Wikidata Q589212, class allow-list match (w-wdresolver-0926)View the Source Wikipedia: FV510 Warrior
Operated By: British Army, Wikipedia article textQuote, Operated By: British Army, Wikipedia article text
The project was begun in 1972; GKN Defence won the production contract in 1984 and the Warrior was accepted for service with the British Army in November 1984.
View the Source Reader Challenges (0)
No disputes yet. Spotted an error or a better source? Open the first one.
Sign in to dispute this or suggest a correction.